Reconciliation Cell

Functions:

Reconciliation Cell, O/o Chief Engineer (Power) performs the following functions:

  • Reconciliation of billing disputes between Punjab Government Departments and DISCOs in Punjab regarding wrong / disputed billing.
  • Preparation and Management of Database for electricity connections of Punjab Government.
  • Ensure online availability of electricity billing data to the concerned Departments through Web-based System.
  • Facility for online monitoring, assessment of over billing, downloading of disputes data sheets, dispute entries, reporting and reconciliation statements through Web based System.
  • Necessary action to eliminate irrelevant connections.
  • Preparation of 25% payment for at source deductions in compliance of CCI decision.
  • Promote Timely Payments and dispatch vital information to Government of Punjab Departments to avoid late payment surcharges.
  • Create awareness to Departments.
  • Necessary action in order to replace the defective electricity meters.
  • Apply correct tariff to the connections.
  • Stop billing against disconnected / not in use connections.
  • Stoppage of billing on average basis against correct meters due to excessive meter reading.
  • Stoppage of detection bills / bill adjustments.
  • Survey of public electricity connections on random basis to identify overbilling.

ELECTRICITY BILLING RECONCILIATION SYSTEM (EBRS):
Login to E.B.R.S. (Electricity Billing Reconciliation System)
 

Achievements and Completed Projects:

i)    Reconciliation of Govt. of Punjab Electricity Connections by Installing AMI Meters (Pilot Project):

  • Reconciliation Cell executed the AMI Pilot Project through ADP Scheme 2014-15 for the Reconciliation of Government of Punjab electricity connections by installing AMI meters as "check meters" in series with DISCOs billing meters.
  • Total cost Project of Rs.156.000 Million.
  • 1698 Nos. AMI meters were installed by Contractor during FY 2016-17 against the connections having load range from 500 KW downward to 20 KW.
  • Project was completed on 30-06-2020.

    rc1rc2

ii)    Reconciliation of Govt. of Punjab Electricity Connections by Installing AMI Meters (2nd Phase Project):

  • Reconciliation Cell executed the AMI 2nd Phase Project through ADP Scheme 2016-17 for the Reconciliation of Government of Punjab electricity connections by installing AMI meters as "check meters" in series with DISCOs billing meters.
  • Total cost of the Project Rs. 290.000 Million.
  • 3193 No’s AMI meters were installed by Contractor during FY 2017-18 & FY 2018-19 against the connections having load from 500 KW downward to 20 KW.
  • Project was completed on 30-6-2020.

      rc3rc4

iii)    Installation of AMI Meters at Public Connections of Punjab (Phase-III):

  • Reconciliation Cell has also executed phase-III of AMI Project under ADP scheme in FY 2022-23 for the Reconciliation of Government of Punjab electricity connections by installing AMI meters as "check meters" in series with DISCOs billing meters.
  • Total cost of the Project Rs.394.580 million.
  • Under this project installation of total 1924 AMI meters completed on Dec 2024 against load range 05KW to 500KW.
  • In the PC-1 of this project, total 09 project posts were approved including one post of Chief Engineer (BS-20) and one post of Director Technical (BS-19).
  • Project completed on 30-06-2025; Warranty period of THREE years started from 2nd January, 2025.

     rc5rc6

 

ON GOING PROJECT:

Installation of AMI Meters at MDI Public Connections in LESCO:

  • Reconciliation Cell is executing this project in FY 2025-26.to install MDM (Metering Data Management) and AMI meters as "check meters" in series with LESCO billing meters for Punjab Govt. connections with load range 20KW to 500KW.
  • Total cost of the Project Rs. 414.893 million.
  • Under this project installation of total 770 MDI AMI meters in LESCO is recommended along with installation of MDM with data capacity for 15,000 meters.
  • In the PC-1 of this project, total 02 project posts (in PPS 08 & PPS  06) were approved for IT team Reconciliation Cell.
  • Project Gestation period is 28th February, 2027.